TECON Plastic Formwork TP60
The lightest reusable hand-set system formwork for wall, column and slab
TECON Plastic Formwork TP60 is a lightweight, durable ABS system designed for fast, versatile construction. Easy to assemble and dismantle without skilled labor or lifting equipment, it can form walls, slabs, and columns in confined spaces. Reusable and robust, TP60 supports rapid construction cycles and cost-effective operations, making it a practical alternative to other formwork system.
Features & Benefits
Plastic Formwork TP60 Features and Benefits
- Versatile Applications – Flexible panel sizes allow walls and slabs of various shapes, supporting modular construction in a single pour.
- Handset & Cost-Efficient – Panels weigh only 9.7 kg, easy to handle without cranes, enabling quick assembly and stripping while reducing labor and material costs.
- Durable and Long-Lasting – Modified thermoplastic panels with high-rib design are reusable up to 100 times, easy to clean, store, and fully recyclable, ensuring reliable performance across climates.
- Safe and Worker-Friendly – Lightweight and ergonomic design reduces handling risks and worker fatigue, improving on-site safety.
- Fast and Sustainable Construction – Minimal components and simple connections shorten project cycles, reduce timber use, and lower waste, supporting sustainable building practices.
Plastic Formwork TP60 Application
Wall structures; slabs and beams; columns; residential buildings; commercial buildings; modular houses; basements; elevator shafts; swimming pools
Technical Specifications
Plastic Formwork TP60 Technical Specifications
| System Type | Plastic Panel Modular System |
| Material | ABS |
| Dimensions | 1.2/0.4/0.35/0.3/0.25/0.2/0.18×0.6m |
| Standard Shoirng | Light Duty Prop |
| Panel Weight | 14 kg/m2 |
| Max Panel Size | 1.2×0.6 m |
| Panel Depth | 75 mm |
| Max Permissible Fresh Concrete Pressure | 60 kN/m2 for wall; 80 kN/m2 for column |
| Max Casting Slab Thickness | 300 mm |
| Installation Time | 40 m2/person/day |
| Handling Method | Manual |
| Load Quantity | Around 180 m2 per 20 GP container; 450 m2 per 40 HQ container (with accessories) |
Formwork Products You May Also Like
All ProductsProjects Show
All ProjectsYour burning questions, answered
How to get a quotation?
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
What is the payment term?
By T/T or L/C.
What is the lead time?
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.
