TECON Alu-Flex Slab Formwork
The fastest aluminum frame panels for slab with drop heads
TECON Alu-Flex Slab Formwork is an innovative lightweight formwork system that improves construction efficiency through modular design. With simplified components and early dismantle design, it allows fast and easy assembly, and its aluminum panels can be positioned manually without cranes, significantly cutting labor and project time.
Features & Benefits
Alu-Flex Slab Formwork Features and Benefits
- Easy Handling – Lightweight aluminum panels minimize labor intensity and accelerate on-site assembly.
- Early Strip Head – Allows early removal of formwork panels, increasing panel turnover and lowering overall material input.
- Economical & Safe – Optimized beam–prop spacing reduces material use, while the beam bracket ensures edge protection and adaptability to varying slab depths. Wind-resistance nodes improve safety in high-risk environments, and single-side hanging enables secure, flexible installation.
- High Utilization – Lined with replaceable 10 mm TECON-Form birch plywood (30-50 uses) that is simple to maintain, enabling repeated use across multiple projects.
- Flexible Layout Adaptability – Modular design with specially-designed accessories accommodates diverse beam, column, and slab arrangements.
Alu-Flex Slab Formwork Application
Frame structure such as slab-beam structure, few beam Structure;large-area slab;standard slab construction
Technical Specifications
Alu-Flex Slab Formwork Technical Specifications
| System Type | Aluminum Panel Slab Formwork |
| Material | 6061-T6 / 6082-T6 Aluminum Alloy |
| Dimensions | Panel Length: 1.8, 1.2, 0.9m Panel Widths: 1.8, 1.2, 0.9, 0.75, 0.6 m |
| Panel Weight | 11.31 kg/m2 |
| Standard Shoring | Medium Duty Prop; Class D Heavy Duty Prop (EN 1065) |
| Max Panel Size | 1.8×1.8 m |
| Panel Depth | 142 mm |
| Max Permissible Slab Thickness | 400 mm with standard shoring props; 700 mm by adding middle shoring props |
| Installation Time | 180 m2/person/day |
| Handling Method | Manual |
| Formlining | 10 mm TECON-Form birch plywood |
| Surface Treatment | Powder-coated |
| Early Dismantle System | Enabled with 98 mm drop height |
| Load Quantity | 350 m2 per 40 HQ (with accessories) |
Formwork Products You May Also Like
All ProductsProjects Show
All ProjectsYour burning questions, answered
How to get a quotation?
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
What is the payment term?
By T/T or L/C.
What is the lead time?
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.