TECON TOPAC Formwork
Flexibly used slab panel formwork for fast operation
TECON TOPAC Formwork is a modular slab system designed for fast and efficient construction. Its lightweight panels and simple connections allow two workers to quickly assemble and strip slabs, making the process faster and more cost-effective compared to conventional systems.
Features & Benefits
TOPAC Formwork Features and Benefits
- Lightweight – Panels can be installed manually by two workers without machinery, enabling faster and more efficient slab construction.
- Rapid Slab Cycles – Simplified assembly and stripping shorten construction schedules and reduce labor effort.
- Durable & Reusable – Film-faced birch plywood (30–50 uses) provides a strong, stable, and tough surface, easy to maintain for repeated projects.
- Adaptable Layouts – Supports a variety of slab designs, from simple flat slabs to intricate or high-rise floor structures.
- Wide Project Compatibility – Suitable for flat slabs, complex floor layouts, and projects ranging from residential buildings to high-rise developments.
TOPAC Formwork Application
Flat slabs; complex floor plans; residential buildings; commercial buildings; high-rise buildings; bridges
Technical Specifications
TOPAC Formwork Technical Specifications
| System Type | Aluminum Panel Slab Formwork |
| Material | 6061-T6 / 6082-T6 Aluminum Alloy |
| Dimensions | Panel Length: 1.8, 1.2, 0.9 m Panel Widths: 1.8, 1.2, 0.9, 0.75, 0.6 m |
| Panel Weight | 18 kg/m2 |
| Standard Shoring | Medium Duty Prop, Class D/E Heavy Duty Prop (EN1065) |
| Max Panel Size | 1.8×1.8 m |
| Panel Depth | 142 mm |
| Max Permissibe Slab Thickness | 400mm with regular shoring support; 750mm with middle shoring support |
| Installation Time | 180 m2/person/day |
| Formlining | 10 mm TECON-Form Birch Plywood |
| Surface Treatment | Powder-coated |
| Early Dismantle System | Optional |
| Handling Method | Manual |
| Load Quantity | 350 m2 per 40 HQ container |
Formwork Products You May Also Like
All ProductsProjects Show
All ProjectsYour burning questions, answered
How to get a quotation?
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
What is the payment term?
By T/T or L/C.
What is the lead time?
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.
