TECON Shoring Tower TST60
The fastest frame shoring system for great heights and heavy loads
TECON Shoring Tower TST60 is a universal modular scaffolding system designed for diverse shoring needs. Its lightweight yet strong construction provides a cost-effective solution for formwork support, while the modular design enables quick assembly and flexible adjustment, making it ideal for high shoring and heavy-load applications.
Features & Benefits
Shoring Tower TST60 Features and Benefits
- Simple & Efficient Assembly – Few component types allow quick assembly, and the tower can be moved as a whole, saving time and improving site efficiency.
- Easy Transportation – Lightweight, frame-type design enables one-time relocation up to 15 m, reducing labor and speeding up construction cycles.
- High Load Capacity – Each leg supports up to 60 kN with a 2.5 safety factor (fully complied with EU Standard), ensuring dependable performance for slabs, beams, and heavy-load applications.
- Adaptable – Shoring height and width can be quickly and continuously adjusted to suit different spans, heights, and site conditions.
- Versatility – Adapts to various slab and beam loads, avoids repeated assembly, and fits multiple project types, from bridges to factories and subways.
Shoring Tower TST60 Application
Bridge construction; subway projects; hydro power stations; factories; logistics centers; commercial buildings; industrial engineering projects
Technical Specifications
Base 20 Wall Formwork Technical Specifications
| System Type | Shoring System |
| Material | Q355 Steel Profile |
| Diameter | 60×3 mm |
| Standard Frame Size | 1.5×1.5/1.2/1.0 m;
1.2×1.2/1.0 m |
| Max Support height | 30 m |
| Load Capacity | 60 kN/leg (up to 13 m) |
| Installation Time | 180 m3/person/day |
| Handling Method | Trolley/Tower Crane |
| Load Quantity | Around 13 t per 40 HQ container |
Formwork Products You May Also Like
All ProductsProjects Show
All ProjectsYour burning questions, answered
How to get a quotation?
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
What is the payment term?
By T/T or L/C.
What is the lead time?
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.
