TECON Base 20 Wall Formwork
Customized and widely used timber beam formwork for all sizes and shapes vertical structure
TECON Base 20 Wall Formwork is a versatile wall formwork system suitable for walls of various sizes, shapes, and complexity. Its independent components allow flexible assembly, making it ideal for both standard configurations and curved structures. The system ensures quick setup, high reusability, and strong cost-efficiency across different project needs.
Features & Benefits
Base 20 Wall Formwork Features and Benefits
- Versatile for All Wall Shapes – Panels up to 9 m high with adjustable widths and pre-engineered steel walings adapt easily to straight, angled, or curved walls, enabling precise formwork for complex designsa .
- Fresh Concrete Bearing Capacity – Engineered girder-waler spacing safely withstands fresh concrete pressures up to 90 kN/m², combining strength with adaptable design.
- Customizable Components – Choose plywood in birch, hardwood, poplar, or hollow plastic board (up to 50 uses), and swap H20 timber beams for aluminum to suit different project needs and extend system lifespan.
- Flawless Concrete and Cost-Effective – High-quality formwork ensures smooth concrete surfaces with minimal post-treatment, combining architectural quality and cost efficiency.
- Climbing System Compatible – Integrates smoothly with TECON climbing solutions for higher-level wall construction.
Base 20 Wall Formwork Application
Residential; commercial buildings; tanks; basement; bridge abutment and piers; irregular structure projects
Technical Specifications
Base 20 Wall Formwork Technical Specifications
| System Type | Timber Wall Formwork |
| Material | Imported spruce wood, H20 timber beam, aluminum beam, and steel accessories |
| Formwork Weight | 65 kg/m2 |
| Max Unit Size | 5×6 m |
| Max One-time Casting Height | 12 m |
| Max Bearing Capacity | 90 kN/m2 |
| Installation Time | 100 m2/day/unit (A group 4-6 people) |
| Formlining | 18/21 mm birch plywood, hardwood, and polar plywood;
Hollow Plastic Board; TECON Plas-tech |
| Size and Shape | Customized |
| Handling Method | Tower Crane |
| Load Quantity | Around 350 m2 per 40 HQ container (with accessories) |
Formwork Products You May Also Like
All ProductsProjects Show
All ProjectsYour burning questions, answered
How to get a quotation?
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
What is the payment term?
By T/T or L/C.
What is the lead time?
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.
