Fast, modular early-stripping aluminum beam slab formwork with full-sheet plywood

TECON APEX DEK is a modular aluminum beam slab formwork system with an early-strip design, integrated column-edge solutions, and rapid cycle times. Using Aluminum Main Beam and Flex Beam, it is compatible with the Alu-Flex Slab Formwork system, enabling fast, precise, and efficient installation across multi-column slabs.

Features & Benefits

APEX DEK Slab Formwork Features and Benefits

  • Modular Design – Modular aluminum beams enable fast, precise slab planning and full-sheet plywood installation without cutting.
  • Early Stripping – Early-strip mechanism shortens slab cycles to 4–7 days while maximizing formwork reuse.
  • System Integration – Seamless integration with Alu-Flex simplifies column-edge treatment and reduces temporary components.
  • Simplified Handling – Streamlined components allow single-worker handling, improving site organization and safety.
  • Higher Efficiency – Faster installation and high reuse efficiency reduce labor demand and deliver long-term project value.

APEX DEK Slab Formwork Application

Ideal for large-area slab construction in residential, commercial, and industrial projects.

Technical Specifications

APEX DEK Slab Formwork Technical Specifications

System Type Aluminum Beam Modular Formwork
Material 6005-T6 Aluminium Alloy
Dimensions Main Beam Sizes: 1.8, 1.5, 1.2, 0.9 m
Flex Beam Size: 1.5, 1.32, 1.2, 0.9, 0.75, 0.6 m
Standard Shoring Medium Duty Prop; Class D Heavy Duty Prop (EN 1065)
Max Panel Size 1.8×1.5 m
Max Permissible Slab Thickness 500 mm
Installation Time 100~150 m2/person/day
Handling Method Manual
Formlining 18 mm TECON-Form birch plywood

Replaceable*

Early Dismantle System Compatible with TECON Alu-Flex Slab Formwork
Load Quantity 450 m2 per 40 HQ Container (with shoring props)

Your burning questions, answered

How to get a quotation?

You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.

Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.

What is the payment term?

By T/T or L/C.

What is the lead time?

For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

For other systems, the lead time is from 30 to 45 days.

For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.

    Make an inquiry!

    Please fill out the form below and we'll contact you as soon as possible.

    Name *

    Email *

    Your Products *

    Your Country *

    Message *