TECON HETO Frame Wall Formwork
Efficient and durable steel frame panel system for wall with only one standard clamp
TECON HETO Frame Wall Formwork is a modular, crane-assisted formwork system for walls and columns, featuring quick-connect couplers for rapid installation. It allows a two-worker team to complete assembly efficiently, delivering streamlined site operations and long-term reusability.
Features & Benefits
HETO Frame Wall Formwork Features and Benefits
- Maximise on-site efficiency – Features quick-connect HC Alignment Couplers for rapid installation, with optional clamps available for additional cost-saving.
- Superior Concrete Finish – Provides a smooth, high-quality concrete surface with a flawless appearance.
- Higher Loading Capacity – The optimized 73 mm panel depth allows more panels to be loaded into each container, reducing overall logistics costs and saving storage space.
- Optional panel design-offers H panel and HM panel to which can meet wall structural and column structure or use in a combination.
- Durable-Built with durable, corrosion-resistant materials and featuring replaceable TECON-Form birch plywood (30-50 uses), the system drastically reduces maintenance and replacement expenses.
- Project Versatility–The adaptable design supports L-, T-, and U-shaped walls, allowing you to handle a broad variety of projects.
Adjustable HETO Frame Column Formwork Application
Various sizes columns in residential & commercial buildings, infrastructure projects.
Technical Specifications
HETO Frame Wall Formwork Technical Specifiications
| System Type | Steel Panel Wall Formwork |
| Material | Q355 Steel Profile |
| Dimensions | H Panel heights: 3.0, 2.4, 1.5, 1.2 m Panel Widths: 0.9, 0.75, 0.5, 0.35 m |
| Panel Weight | 35.3 kg/m2 |
| Max Panel Size | 3*0.9 m |
| Panel Depth | 73 mm |
| Max Permissible Fresh Concrete Pressure | 60 kN/m2 |
| Installation Time | 100-200 m2/2 person/day |
| Formlining | 15 mm TECON-Form birch plywood (12 mm option available*) |
| Surface Treatment | Powder-coated (service life over 5 years with proper maintenance); Hot-dip galvanized option available* |
| Connection Technology | Adjustable Alignment Coupler with 180 mm range with the use of wooden fillers; Clamps |
| Load Quantity | Around 580 m² per 40HQ container (with 3 × 0.9 m panels and accessories) |
| Handling Method | Tower Crane |
Formwork Products You May Also Like
All ProductsProjects Show
All ProjectsYour burning questions, answered
How to get a quotation?
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
What is the payment term?
By T/T or L/C.
What is the lead time?
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.
