TECON Base 20 Wall Formwork

Customized and widely used timber beam formwork for all sizes and shapes vertical structure

TECON Base 20 Wall Formwork is a versatile wall formwork system suitable for walls of various sizes, shapes, and complexity. Its independent components allow flexible assembly, making it ideal for both standard configurations and curved structures. The system ensures quick setup, high reusability, and strong cost-efficiency across different project needs.

Features & Benefits

Base 20 Wall Formwork Features and Benefits

  • Versatile for All Wall Shapes – Panels up to 9 m high with adjustable widths and pre-engineered steel walings adapt easily to straight, angled, or curved walls, enabling precise formwork for complex designsa .
  • Fresh Concrete Bearing Capacity – Engineered girder-waler spacing safely withstands fresh concrete pressures up to 90 kN/m², combining strength with adaptable design.
  • Customizable Components – Choose plywood in birch, hardwood, poplar, or hollow plastic board (up to 50 uses), and swap H20 timber beams for aluminum to suit different project needs and extend system lifespan.
  • Flawless Concrete and Cost-Effective – High-quality formwork ensures smooth concrete surfaces with minimal post-treatment, combining architectural quality and cost efficiency.
  • Climbing System Compatible – Integrates smoothly with TECON climbing solutions for higher-level wall construction.

Base 20 Wall Formwork Application

Residential; commercial buildings; tanks; basement; bridge abutment and piers; irregular structure projects

Technical Specifications

Base 20 Wall Formwork Technical Specifications

System Type Timber Wall Formwork
Material Imported spruce wood, H20 timber beam, aluminum beam, and steel accessories
Formwork Weight 65 kg/m2
Max Unit Size 5×6 m
Max One-time Casting Height 12 m
Max Bearing Capacity 90 kN/m2
Installation Time 100 m2/day/unit (A group 4-6 people)
Formlining 18/21 mm birch plywood, hardwood, and polar plywood;

Hollow Plastic Board;

TECON Plas-tech

Size and Shape Customized
Handling Method Tower Crane
Load Quantity Around 350 m2 per 40 HQ container (with accessories)

Base 20 Wall Formwork 3D Assembly Tutorial

Your burning questions, answered

How to get a quotation?

You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.

Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.

What is the payment term?

By T/T or L/C.

What is the lead time?

For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

For other systems, the lead time is from 30 to 45 days.

For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.

    Make an inquiry!

    Please fill out the form below and we'll contact you as soon as possible.

    Name *

    Email *

    Your Products *

    Your Country *

    Message *