TECON Aludeck Slab Formwork
A lightweight, high-stability slab formwork system designed for high load capacity and robust shoring in medium to mega projects
TECON Aludeck Slab Formwork is a lightweight and stable slab formwork system designed for medium to large projects. It is widely adopted in developed countries and mature construction markets, combining modular aluminum panels with TMP props to provide higher and more stable support for slab structures. The clear assembly process and lightweight components enable fast, crane-free installation with a small team, ensuring smooth and reliable site operations.
Features & Benefits
Aludeck Slab Formwork Features and Benefits
- Handset and Cost-Efficient – All components can be lifted and assembled manually, reducing the need for a crane, minimizing props, and lowering overall project expenses.
- Fast Forming Cycles – Simple setup and stripping steps, combined with reduced lifting and easy handling, help shorten construction time and improve on-site safety.
- Durable TECON-Form birch plywood – Each panel features durable TECON-Form birch plywood, delivering 30–50 reuses with a replaceable facing for long-term sustainability and cost efficiency.
- Efficient Load Support – TMP props carry high slab loads with fewer supports, improving on-site efficiency, safety, and reducing labor and maintenance.
- Long-Term Value – Replaceable components and durable materials extend service life, reduce maintenance, and maximize cost efficiency over multiple projects.
Aludeck Slab Formwork Application
Standard slabs; large area slabs; residential projects; commercial buildings; industrial projects
Technical Specifications
Aludeck Slab Formwork Technical Specifications
| System Type | Aluminum Panel Slab Formwork |
| Material | 6061-T6 / 6082-T6 Aluminum Alloy |
| Dimensions | Panel Length: 1.5, 0.75 m Panel Widths: 0.75, 0.5, 0.35 m |
| Panel Weight | 15 kg/m2 |
| Standard Shoring | Multi-purpose Aluminum Prop (TMP Prop) |
| Max Panel Size | 1.5×0.75 m |
| Panel Depth | 120 mm |
| Max Permissible Slab Thickness | 1000 mm |
| Installation Time | 150 m2/person/day |
| Formlining | 9 mm TECON-Form birch plywood |
| Early Dismantle System | Optional |
| Handling Method | Manual |
| Load Quantity | Around 300 m2 per 40HQ Container (with accessories) |
Formwork Products You May Also Like
All ProductsProjects Show
All ProjectsYour burning questions, answered
How to get a quotation?
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
What is the payment term?
By T/T or L/C.
What is the lead time?
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.
