TECON Alumi Frame Wall Formwork

The lightweight panel formwork for building and civil construction

TECON Alumi Frame Wall Formwork is a lightweight wall formwork system designed for efficient vertical wall construction. Its crane-free, easy-handling design streamlines on-site operations and speeds up wall assembly. With a durable modular structure that supports frequent reuse, it delivers long-term cost benefits and strong adaptability for a wide range of wall-forming applications.

Features & Benefits

Alumi Frame Wall Formwork Features and Benefits

  • Manual Handling – Lightweight panels can be lifted and put in place by just two workers, no crane needed, speeding up work on site.
  • Simple Connections –A single alignment coupler works for nearly all joints, simplifying assembly and saving time.
  • Easy to refurbish – Constructed with 6061-T6 aluminum and TECON-Form birch plywood (30–50 uses), panels resist wear and are simple to clean and maintain.
  • Flexible Wall Forming – Built-in tie points speed up vertical wall work, and just four panel widths cover most layout requirements.
  • Multi-position Use – Lightweight aluminum panels are easy to handle and can be applied both vertically and horizontally, making them ideal for foundations and similar applications.

Alumi Frame Wall Forwmork Application

Foundations; basement and storey-level walls; ground beams; swimming and adventure poolsr; rectangular piers and columns; parapets and retaining walls; supply shafts and small traffic tunnels; refurbishment projects

Technical Specifications

Alumi Frame Wall Formwork Technical Specifications

System Type Aluminum Panel Wall Formwork
Material 6061-T6 / 6082-T6 Aluminum Alloy
Dimensions Panel heights: 3.0, 2.5, 1.25, 0.75 m
Panel Widths: 1.0, 0.75, 0.5, 0.25 m
Panel Weight 27 kg/m2
Max Panel Size 3*1 m
Panel Depth 117 mm
Max Permissible Fresh Concrete Pressure 60 kN/m2
Installation Time 150 m2/2 person/day
Formlining 15 mm TECON-Form birch plywood
Connection Technology Alignment Coupler with 0-10 cm adjustable wide range when used with wooden fillers
Handling Method Manual/Tower Crane
Surface Treatment Powder-coated
Load Quantity Around 400 m2 per 40 HQ container (with 3×1 m panels and accessories)

Your burning questions, answered

How to get a quotation?

You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.

Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.

What is the payment term?

By T/T or L/C.

What is the lead time?

For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

For other systems, the lead time is from 30 to 45 days.

For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.

    Make an inquiry!

    Please fill out the form below and we'll contact you as soon as possible.

    Name *

    Email *

    Your Products *

    Your Country *

    Message *