When it comes to construction scaffolding, the materials used in the construction of high-level scaffolding must meet the quality requirements.
On-site scaffolding has brought a lot of convenience to the construction.
The building formwork used for the construction of a cast-in-place concrete structure is mainly composed of three parts: panel, supporting structure, and connecting parts. The panel is a bearing plate that directly contacts the newly poured concrete.
Before stripping aluminium formwork, the general contractor should sign on the approval form for the early dismantling of aluminum formwork.
It is best to perform a pressure test for assembled table formwork units.