TECON HETO Frame Wall Formwork

Efficient and durable steel frame panel system for wall with only one standard clamp

TECON HETO Frame Wall Formwork is a modular, crane-assisted formwork system for walls and columns, featuring quick-connect couplers for rapid installation. It allows a two-worker team to complete assembly efficiently, delivering streamlined site operations and long-term reusability.

Features & Benefits

HETO Frame Wall Formwork Features and Benefits

  • Maximise on-site efficiency – Features quick-connect HC Alignment Couplers for rapid installation, with optional clamps available for additional cost-saving.
  • Superior Concrete Finish – Provides a smooth, high-quality concrete surface with a flawless appearance.
  • Higher Loading Capacity – The optimized 73 mm panel depth allows more panels to be loaded into each container, reducing overall logistics costs and saving storage space.
  • Optional panel design-offers H panel and HM panel to which can meet wall structural and column structure or use in a combination.
  • Durable-Built with durable, corrosion-resistant materials and featuring replaceable TECON-Form birch plywood (30-50 uses), the system drastically reduces maintenance and replacement expenses.
  • Project VersatilityThe adaptable design supports L-, T-, and U-shaped walls, allowing you to handle a broad variety of projects.

Adjustable HETO Frame Column Formwork Application

Various sizes columns in residential & commercial buildings, infrastructure projects.

Technical Specifications

HETO Frame Wall Formwork Technical Specifiications

System Type Steel Panel Wall Formwork
Material Q355 Steel Profile
Dimensions H Panel heights: 3.0, 2.4, 1.5, 1.2 m
Panel Widths: 0.9, 0.75, 0.5, 0.35 m
Panel Weight 35.3 kg/m2
Max Panel Size 3*0.9 m
Panel Depth 73 mm
Max Permissible Fresh Concrete Pressure 60 kN/m2
Installation Time 100-200 m2/2 person/day
Formlining 15 mm TECON-Form birch plywood (12 mm option available*)
Surface Treatment Powder-coated (service life over 5 years with proper maintenance); Hot-dip galvanized option available*
Connection Technology Adjustable Alignment Coupler with 180 mm range with the use of wooden fillers; Clamps
Load Quantity Around 580 m² per 40HQ container (with 3 × 0.9 m panels and accessories)
Handling Method Tower Crane

HETO Frame Wall Formwork 3D Assembly Tutorial

Your burning questions, answered

How to get a quotation?

You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.

Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.

What is the payment term?

By T/T or L/C.

What is the lead time?

For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

For other systems, the lead time is from 30 to 45 days.

For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.

    Make an inquiry!

    Please fill out the form below and we'll contact you as soon as possible.

    Name *

    Email *

    Your Products *

    Your Country *

    Message *